ENERGY
FUTURE
ENERJİ
FUTURE
VERRA PLASTİC WASTE REDUCTİON PROGRAM CERTİFİCATİON PROCESS LOCAL STAKEHOLDER INFORMATİON MEETİNG15-12-2022
We initiated the VERRA Plastic Waste Reduction Program Certification Process and organized our Local Stakeholder information meeting. As Kartallar Ege Recycling Energy Production Inc., we shared our contributions to reducing carbon emissions through plastic waste recycling with our participants.
Our organization aims to combat the global climate crisis, separate and recycle plastic waste,...
Doruk College Kindergarten TripLoving and protecting nature, exploring environmental problems and solutions to these problems are the foundations of environmental education. Therefore, raising environmentally conscious children is an important issue for both ourselves and the whole world.
As Kartallar Ege Recycling Energy Production Inc., we hosted Doruk College Kindergarten students in our facility and showed the students that many...
EIF WORLD ENERGY CONGRESS & EXPO12 / 14-10-2022
We are happy to see “KARTALLAR EGE GERİ DÖNÜŞÜM ENERJİ ÜRETİM A.Ş.” among us at the EIF2050 World Energy Congress and Expo, which will take place on 12-14 October 2022
CARBON CERTIFICATION PROCESS STAKEHOLDER MEETING17-07-2022
Public and private sector organizations that reduce greenhouse gas emissions or reduce existing greenhouse gases can obtain an emission permit and obtain a Certificate for "Carbon Reduction Projects" even if they are not subject to the Kyoto Protocol. This is why we, as Kartallar Ege, for Biomass Power Plant have applied to...
IZMIR WE CYCLE ENVIRONMENT AND RECYCLING FAIR12 / 14-05-2022
On the way to becoming a resilient city, in order to leave a livable environment for future generations, to prevent and reduce the generation of waste in the city, to collect the waste separately at the source and recycle it, to spread the recycling culture in the society, to raise awareness and to prevent the...
ANKARA FAIR ECO CLIMATE ECONOMY AND CLIMATE CHANGE SUMMIT30 / 31-03-2022
In order to prepare for global regulations in the most accurate and rapid manner on the subjects of “Climate Change” and “Green Transformation”, to combat climate change and to create a common mind for minimizing its negative impact on the economy, The World’s frst Economy and Climate Change Summit took place at the ATO Congresium...

Hope for the future with renewable Energy
BIOMASS
The facility that is located within the boundaries of “Kartallar Aegean Waste Recycling Facility” in Manisa Province, Yunusemre County continues to produce electrical energy by converting domestic waste from Manisa province and its districts into ATY (Waste Derived Fuel) with 18.660 MWm / 18.054 MWe capacity.
BIOGAS
Uzunburun Biogas Energy Production Plant, which is located within the boundaries of “Kartallar Aegean Recycling Energy Production Facility” in Yunusemre District of Manisa Province, provides electrical energy production from methane gas, which is generated from domestic waste provided from Manisa province and its districts, with a capacity of 6,821 MWm / 6,630 MWe.
LOTS AND WASTE COLLECTIONThe total waste Storage Capacity of the Storage Area is 970,078 cubic meters in Lot-1 , 1,240,929 cubic meters in Lot-2, both equals to a total of 2,211,007 cubic meters,on the other hand the construction of third lot with an approximate capacity of 6,000,500 cubic meters consisting of 3,260,000 cubic meters domestic waste and 3,240,000 cubic meters industrial waste is ongoing. Construction of Lot 4 with a capacity of 6 ,000,000 cubic meters is at planning stage.
Mechanical biological sorting facility has an annual capacity of 607,200 tons. Through Mechanical sorting facility each year 66,792 tons of recyclable materials is seperated.
Urban and industrial wastes collected for disposal and recycling within the borders of Manisa Province are sorted at the facility and brought back into the economy.
The wastes brought to the recycling facility are sorted into main groups as metal, plastic, organic waste and RDF waste.
While metal alloy and plastic wastes are sold to the market and recycled, other wastes are used to obtain electrical energy in power generation enterprises established in the integrated facility.
Starting with a daily capacity of 60 cubic meters, with the addition of the new 500 cubic meters runaway water treatment facility which will be commissioned in (250+250) stages the runaway water treatment facility will reach a total capacity of 560 cubic meters. purified water with a total capacity of 560 cubic meters will be transmitted.
Applications and Open Positions >
CAREER
Working for today and tomorrow by adding value to the future, Kartallar Ege Recycling Energy Generation Inc. has been carrying out its activities with a growing team since its establishment. It adds value to human and environmental life with its experienced staff in line with the human rights, labor standards, transparency and accountability principles of the UN Global Compact.You, too, can contact us to become a part of Kartallar Ege Recycling Energy Production Inc., which prioritizes staying true to company values with solid steps taken into the future.



